
Objectives:
Elimination of manual deburring
- Reduction of lead time and cost
- Improvement in quality
Background and Requirements:
| Material | Aluminum casting |
| Geometric deviation | Max. 3 mm |
| Deburring requirements | 0.2-0.8 mm x 45° |
| Machine | 5-axis milling machine |
| Parts per year | 300 |
Implementation and Results:
| Deflecting tool | Engraflexx LC-UEA |
| Cutter | 85.056.16 |
| Deburring time * | 3.8 min |
| Annual cost savings | 9’200 USD |
* complete outer geometry
