
Objectives:
Elimination of manual deburring of large castings
- Reduction of lead time and cost
- Improving workplace safety
- Improvement in quality
Background and Requirements:
| Material | GJS 500-7 |
| Geometric deviation | Max. 5 mm |
| Deburring requirements | 1 mm x 45° |
| Machine | Portal milling machine |
| Parts per year | 80 |
Implementation and Results:
| Deflecting tool | Engraflexx LC-S / LC-E |
| Cutter | 85.056.16 |
| Deburring time * | 12min |
| Annual cost savings | 12’500 EUR |
* Deburring of all housing components (transition from cast to milled structure)
